Short answer. A home charger install has to meet building regulations, so it is either certified by a registered competent person or inspected by building control (local authority). You should get an electrical certificate, your local electricity network company should be told, and the charger must meet the smart charge point rules. Planning permission is often not needed.
Building rules for electrical work
Fitting a charger creates a new circuit, which is notifiable electrical work. It is either self-certified by an installer registered with a competent person scheme, or notified to building control (local authority). Building control is only involved where it is needed. Keep the certificate.
Electrical certificate
You should receive an electrical certificate for the work. We give you one with every installation and will also tell your local electricity network company. Keep it with your home documents, because buyers, insurers and landlords sometimes ask for it.
Smart charge point regulations
Chargers sold for home use in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021, in force since 30 June 2022. In plain terms the charger has to be able to be scheduled, comes with preset off-peak hours you can change, picks a random start time and meets security requirements. It must keep charging if its internet connection drops.
Planning permission
In England a wall-mounted charger at a house usually does not need planning permission if it stays within size and position limits. For example, the outlet must not be more than 1.6 metres above the ground, only one is allowed, and it cannot be in a conservation area or on the land around a listed building. Different limits apply to a charger on a post (an upstand). Check if a local planning restriction removes the right where you live. Scotland, Wales and Northern Ireland have their own rules.
Check before you drill
- Listed building or conservation area? Speak to your council first.
- Rented or leasehold? Get written permission. See renting.
- Cable across a pavement? See no driveway.
Sources
- Electric vehicle charging: building regulations, Planning Portal. Checked 15 November 2026.
- Electrical safety: Approved Document P, GOV.UK. Checked 15 November 2026.
- Electric vehicle charging: permitted development, Planning Portal. Checked 15 November 2026.
- Regulations: electric vehicle smart charge points, GOV.UK. Checked 15 November 2026.
This guide is general information, not legal or financial advice. Rules and prices change, so we date every guide. The price on your quote is the total you pay. We are not VAT registered, so no VAT is added.